01
Santa Rosa Forensics Lab
Size: 32,000 sf
Mechanical Contract: $3.25 million
Scope/ System: AHU w/ Re-heats, Chiller, Boiler, Phoenix Valve Exhaust System, Sheetmetal Flashing
02
Cal Maritime Simulation Center
size: 21,000 sf
Mechanical Contract: $2.1 million
Scope/System: AHU w/Underfloor Constant Volume Fan Powered Boxes, Chiller, Boiler, Sheetmetal Flashing, Composite Paneling
03
Station Park Green Mixed- Use
Size: 132 Residential Units
Mechanical Contract: $3.56 million
Scope/ System: Ducted Split System Heat Pumps, RTU's for corridor exhaust, Garage Exhaust w/ CO system, heat pumps and grease exhaust ductwork serving common area future TI
04
San Mateo Performing Arts Center
size: 102,000 sf
Mechanical Contract: $7.55 million
Scope/ System: AHU w/ Underground ductwork from AHU, Chiller, Boiler, Sheetmetal Flashing
​
05
H2 Hotel
Size: 36- Room
Mechanical Contract: $1.78 million
Scope/ System: LEED Gold, VRV System
06
Oakland Children's Hospital Surgery Center TI (OSHPD-1)
Size: 36,000 sf
Mechanical Contract: $3.78 million
Scope/ System: New AHU & Chiller to 18- VAV boxes, Sheetmetal Flashing, Rooftop SST Ductwork across roof and down existing shaft
07
Amazon Distribution Center
Size: 250,000 sf & 196,000 sf
Mechanical Contracts: $7,375,590.00
Scope/ System: Tenant Build out of office area w/ VRV systems & warehouse w/ CO/NO2 Controlling Exhaust fans, Large Blade Exhaust Fans, Make- Up Air Units & Rooftop Package Heat Pumps
​
08
Contact For other jobs worked...